Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | Antminer |
Model Number: | V9 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 10 Stages |
Price: | Negotiable |
Packaging Details: | Carton |
Delivery Time: | 7~14 work days |
Payment Terms: | USDT |
Supply Ability: | 100 PIECES/DAY |
Detail Information |
|||
Algorithm: | SHA256 | Rated Hashrate: | 4TH/S,±5% |
---|---|---|---|
Rated Power: | 1027W,±10% | Power Efficiency: | 0.25J/GH,±10% |
Machine Size: | 301mm*123mm*155mm | Weight: | 3.05kg |
Production Currency: | BTC | Internet Connection: | Ethernet |
High Light: | V9 Antminer BTC Miner,1027W Antminer BTC Miner,Ethernet Air Cooling Antminer BTC Miner |
Product Description
V9 Antminer BTC Miner ASIC 4TH/S 1027W SHA256 Ethernet air-cooling Chip BM1580:
Antminer v9 is the most common mining machine on the market today, with a computing power of 4TH/S, a power consumption of 1027W, and an energy efficiency ratio of 0.25J/GH. There are 3 computing boards connected to the computing board V9. There are 3 PCIE interfaces on the computing board, and each PCIE interface must be connected to a 12V power cable, a total of 9 12V cables, the efficiency, safety and stability of mining must be guaranteed to a certain extent.
Algorithm | SHA256 |
Rated Hashrate | 4TH/S,±5% |
Rated power | 1027W,±10% |
Power Efficiency | 0.25J/GH,±10% |
Machine size | 301mm*123mm*155mm |
Weight | 3.05kg |
Production currency | BTC |
Internet connection | Ethernet |
Operating temperature | 0~40℃ |
Chip | BM1580 |
Number of chips | 135 |
Number of computing boards | 3 |
Noise | 76dB |
Q:Are there any precautions?
A:If the chassis is deformed or the heat sink has fallen off, please do not turn on the power, you need to contact us for after-sales treatment immediately
Cannot use two power supplies with the same hashrate board
Q:Are the prices on the product map up to date?
A:The price of the product fluctuates with the market, and the price on the product map is a rough range. If you want the latest price, please contact us via email or WhatsApp. We will send you the latest quotation.
Each machine will be tested for computing power before it is sent out, and after the test is completed, it will be individually packaged and sent out.
We will send out the machine within 7~14 working days after you make the payment.
We have our own mine, have our own operation and maintenance personnel, and cooperate with multiple maintenance centers. Before the mining machine is shipped to you, we will test the mining machine and send the test video to you to ensure that the mining machine in your hand can operate normally and minimize the loss of transportation
Enter Your Message