Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | Antminer |
Model Number: | B3 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 10 Stages |
Price: | Negotiable |
Packaging Details: | Carton |
Delivery Time: | 7~14 work days |
Payment Terms: | USDT |
Supply Ability: | 100 PIECES/DAY |
Detail Information |
|||
Product Name: | Antminer B3 | Algorithm: | Tensority |
---|---|---|---|
Rated Hashrate: | 780H/S | Rated Power: | 360W |
Power Consumption Ratio: | 0.46J/H | Production Currency: | BTM |
Weight: | 4.2kg | Machine Size: | 410mm*215mm*255mm |
High Light: | Tensority Ethernet Antminer Miner,360W Asic BTC Miners,ASIC Antminer Miner |
Product Description
B3 780H/S Antminer Miner ASIC 360W Tensority Ethernet 0.46J/H 11.6~13.0V:
Antminer’s official website released the latest product – Antminer B3 at 11:00 am on April 25, 2018. As a new member of the Antminer product line, Antminer B3 has attracted much market attention. According to the information on the official website, Antminer B3 The rated computing power of machine B3 is 780H/s±5%, and the power consumption is about 360W±7%. From the data point of view, the performance of B3 mining machine is relatively stable.
Product name | Antminer B3 |
Algorithm | Tensority |
Rated Hashrate | 780H/S |
Rated power | 360W |
Power consumption ratio | 0.46J/H |
Production currency | BTM |
Weight | 4.2kg |
Machine size | 410mm*215mm*255mm |
Cooling method | air cooling |
Number of fans | 2 |
Noise | 74dB |
Internet connection | Ethernet |
Operating temperature | 0~40℃ |
Q:Are the prices on the product map up to date?
A:The price of the product fluctuates with the market, and the price on the product map is a rough range. If you want the latest price, please contact us via email or WhatsApp. We will send you the latest quotation.
Please provide us with detailed and correct receiving information for smooth transaction.
If you have any problems with the machine when you receive the goods, please contact us in time and we will help you.
If you have any suggestions and needs in the follow-up, please contact us.
Each machine will be tested for computing power before it is sent out, and after the test is completed, it will be individually packaged and sent out.
We will send out the machine within 7~14 working days after you make the payment.
We have our own mine, have our own operation and maintenance personnel, and cooperate with multiple maintenance centers. Before the mining machine is shipped to you, we will test the mining machine and send the test video to you to ensure that the mining machine in your hand can operate normally and minimize the loss of transportation
Enter Your Message